Every group project has the same five characters: the one who does everything, the one who “has ideas,” the one who’s “so busy,” the ghost, and the one who only shows up to argue about font choice.
Our group had all five, perfectly cast. I was, predictably, the one who did everything a role I did not audition for but was apparently typecast into by virtue of replying to the group chat within an hour of it being created. Tolu had “ideas,” which meant he contributed one voice note a week, usually just restating something someone else had already said, but with more confidence. Debby was “so busy,” a status she maintained consistently enough that I began to suspect busy was less a schedule and more a personality trait. Segun was the ghost present in the group chat’s member list, absent from literally every conversation, every meeting, every deadline, right up until the day before submission. And then there was Wale, who joined every call specifically to debate whether the presentation should use Calibri or Times New Roman, with a passion our actual content never once received from him.
The message that lives in my head rent-free came two days before the deadline, when Segun resurfaced after three weeks of total silence to ask, cheerfully, “hey guys what are we presenting again lol.” Lol. He added “lol.” As though his own absence was the punchline, rather than the crime.
We submitted on time, somehow, mostly because I stayed up two nights compiling everyone else’s half-finished contributions into something coherent. We got a good grade. Segun’s name was on the cover slide, right next to mine, in the same font size, for work he contributed approximately zero of.
Would I work with any of them again? Tolu, sure. Debby, in a pinch. Segun and Wale I would rather do the entire project alone, and given the last one, I basically did.
In group projects, as in life: watch who shows up before the deadline, not just before the credit.


